Case Studies
Case studies highlighting the successful use of BCP® products in various applications.
- BCP® 1015 – In an Air Scrubber System and Condenser Water Loop
- BCP® 1015 – In an Injection Molding Facility
- BCP® 1015 – Case Study: Legionella Control Program
- BCP® 2175 – Clean-up of a Heavily Fouled Cooling Tower
- BCP® 2430 – Data Center Process Water Clean Up
- BCP® 2430 – Detergent Manufacturing Facility Case Study
- BCP® 5030 – 7 Day Geothermal Power Cooling System Case Study
- BCP® 5030 – 28 Day Geothermal Power Cooling System Case Study
- BCP® 5030 – 90 Day Geothermal Power Cooling System Case Study
- BCP® 5030 – Sulfur Fouling Deposit Cleaning Using Infrared Thermography (IR)